Groundbreaking at the Carriage House
/over the past two week Action 1 has been working on moving forward with the Carriage House Expansion Project. Equipment and fencing were dropped off on site, a week after Col. Plums Coop was relocated to Lilacia Park. Fencing was erected and green screening was added.
The outhouse, which has been located next to Carriage House was braced and moved behind the Carriage House. On Monday, Action 1 Construction removed the concrete slab where Col. Plum’s Coop was once located and the sidewalk that lead to the Coop was also removed.
Digging for the foundation began also this week as Action 1 Construction prepares the site for the foundation to be poured.